Blogs

Sketch My Roof

Categories


Using the Square Break tool to add roof extensions

Roy
/ Categories: CADO Blog

Have you ever seen a tree in an Xactimate® estimate that listed the Roof as Roof1, Roof2 and so on and only be dealing with one building? If so then the tree in Xactimate may have looked like the one below. I have and in this blog I'm going to show you how to eliminate the multiple entries.  I will not get into editing the name or dimensions in this blog but will in a later blog. I often have to review files and and a tree like this to me makes it harder to get an understanding of what the adjuster is doing.

Tree view

In most cases this is because the estimate writer is using the Roof icon or the "f" key to add a roof extension.  I'm going to create a simple gable roof and show the adding of two extensions using the Roof icon.   Roof Icon

The images below show the steps used when adding an extension in this matter and the results.

Simple Roof

First we start with a simple roof using the roof icon or f key.  Then when we want to add an extension we incorrectly use the roof icon again.

roof3.png

And combine the two extensions by dragging them to the area we want them to appear.

roof11.png

Once the extensions have been added to the diagram above your tree will look like this.

roof4.png

In the example below we use the "Square Break" icon or the "B" key.

roof5.png

 

Once we have the "Square Break" tool active we go to diagram and select the area for the extension.

roof6.png

We use the "Ctrl" key and drag this blue square out to create the extension.

roof7.png

We repeat the process for the second extension.

roof8.png

 

Hold the "Ctrl" key down while with your mouse you grab (left click) and drag the box out to form the extension and end up with a roof diagram as shown below.

roof9.png

Now take a look at our tree.

roof10.png

You can now add your line items to the estimate under one entry, of course Roof1 does not provide much information you could also change the name to just Roof and the group header (Main Level) to Dwelling to indicate Dwelling Roof. We will review changing names and tweaking the diagram in another blog. I have included the above roof sketch template below that you can download and load into your sketch. This tip was made using Xactimate® version 24.10.

Thanks for visiting.

Sketch Template Unzip to use

Comment

Kim Stegall · 11/1/2006 9:00:43 AM

The way you displayed that is really great Roy....really easy to see what you are talking about. I believe you can also get rid of those extra roof numbers by going into the properties of each extension and making them a subroof but your way has less steps!

Roy Cupps · 11/1/2006 9:38:38 AM

Kim,

You are correct about the subroof. As with most task in Xactimate, there are at least two ways to do something. I suggest that users use the method that works best for them. The Properties tab provides additional ways to tweak the diagram as well.

Thanks for the comments .

Dimechimes Corp · 11/1/2006 10:09:10 AM

Great detailed info Roy- I posted a link to this on ClaimSmentor.com for trainee adjusters to benefit from! Deb

Aaron · 11/4/2006 7:23:17 PM

Create the roofs anyway you want, and then when finished drag a box around all the roof structures (so they are all selected) and press CTRL+SHIFT+C to combine all the roofs. The largest one will always be the main roof, and everything else will be subroofs.

Iowa_Adjuster · 1/13/2007 2:06:11 PM

Yes, or simply right click after everything is highlighted and choose "combine" to get the same result. Making the roofs separately allows for more ease of controlling specifications such as separate pitches for dormers and such!

alex t wag · 12/13/2008 7:30:33 AM

new to the adjuster field 30 years in new homes and fire and warder damage looking for help fineing programs for the field

sidd · 6/28/2010 10:05:57 AM

excellent share! this makes life so much easier. i was having a hard time understanding this concept and found your site while doing my research. thanks!<br><br>www.adjusterscampus.com

warning
You don't have permission to post comments.

Past Articles

Note: Since CADO first went online in 1995 we have had many members contribute to the site with their articles and forum posts.  But over the years many of these post were lost however, we have recently been able to recover some of the articles and forum post and will be re-posting them as time allows.   They will be posted on this page (Commuunity Blog) with a note indicating that it was a prior post. RC

Forum Topics

Claim Scenario for Discussion

  Forum Transfer; First posted by Janice Toll The following scenario is presented for discussion: Ms. Insured notices that the shingles on her

Posted By: Janice_Toll
Posted In: General
Replies: 17

I Thought I Had Heard It All

Greetings to everyone from Oaxaca, Mexico, where Jennifer and I are taking a break from our last assignment and staying far away from the demonstratio

Posted By: Medulus
Posted In: General
Replies: 43

HOW SLOW IS IT???

I HAVE BEEN RUNNING THE ROADS FOR 12 YRS.  UP TO THIS POINT EVEN THE SLOW YEARS TREATED ME OK.THIS YEAR HAS BEEN MY SLOWEST EVER.  NONE OF M

Posted By: Catmannn
Posted In: General
Replies: 26

Know your policy

Janice and I worked a commercial loss last week and submitted it for payment 4 days after assignment, through a vendor with a major carrier. This was

Posted By:
Posted In: General
Replies: 37

What to do when the insured is deceased or divorced

I think death and divorce are common issues that rarely get covered in training. Adjusters learn what to do by trial and error, or if they are lucky,

Posted By: Leland
Posted In: General
Replies: 8

Business Casual

Report of duty or a class- Dress code- Business Casual I have been watching the gathering of adjusters for several years. Seems about 25% know the de

Posted By: Ray Hall
Posted In: General
Replies: 23

Fee Schedules

I think someone should have done this a long time ago.  Let's start a list of fee schedules from different carriers and their preferred IA firms.

Posted By: descher
Posted In: Community Chat
Replies: 15

Did I mess up?

 I just got hired by Pilot, I guess. They called and said get your paperwork in and get ready for a drug test. The lady told me that she knew the

Posted By: newguy3
Posted In: General
Replies: 50

Your Reading Files

Your closed files are the best example of your work. When you are looking at all the vendors who are not seeking your commitment during this very slow

Posted By: Ray Hall
Posted In: The Claim File
Replies: 17

Stress and Mental Health of Adjusters

Does anyone know of mental health services needed by or provided to claims adjusters suffering from stress related symptoms after a severe cat? I am c

Posted By:
Posted In: General
Replies: 24

2007 Version of Know before you Go.

My opine is not as good as the experts; but I think a monster hurricane will hit Texas or Florida with in the next 50 days. All new and old adjusters

Posted By: Ray Hall
Posted In: General
Replies: 32

LONG NIGHTS - LONGER DAYS

Much has been stated about the trials and tribulations of life on the road while working a storm. We all know about the non- stop 18 hour days and the

Posted By: margar1
Posted In: Community Chat
Replies: 16

Is the Independent Adjuster Fast Becoming Obsolete?

I have written  more than few times about with Satellite roof technology , the fact that Xactimate is now fully integrated with EagleView and wit

Posted By: CatAdjusterX
Posted In: General
Replies: 36

Poor quality report writing

I just wanted to put in my two cents on how to write better reports. Please check these two examples:   Example #1 (poor quality) When I

Posted By: Leland
Posted In: The Claim File
Replies: 25

Another Blow to Professional Adjusting

Xactware and ServiceMaster have teamed up to offer insurance carriers a contents estimating service.  Now the carriers are using restoration cont

Posted By: johnpostava
Posted In: General
Replies: 30