The overall intent of this quiz is NOT to test your adjusting skills. It is, however intended to broaden your knowledge of the commercial construction industry. As commercial work is entirely different than residential, attempting to adjust a loss with limited knowledge can cause irreparable harm to many.

Having a working knowledge of, and knowing the correct terminology will allow one to be better prepared to deal with a loss in this type of claim. The answers may differ from yours, as there are many varied descriptions and terms used in the trades. These are based on the writer's opinions.

Only by continual exposure to policies, conditions, and construction will we retain the ability to perform the assigned tasks. Good luck to all, and if you can achieve a score above 70, please post it. If you wish to discuss the test or leave your comments please use the forum located here.


1.) What is the diameter (size) of #8 Rebar?
a) 7/8 of an inch b) 5/8 of an inch c) one inch d) 1 1/8 inch

2.) How many yards of 4500# concrete will it take to pour an eight inch slab on 400 SF of flat area?
a) 40 yards b) 10 Yards c) 45 yards d) none of these

3.) What is the normal curing time for poured concrete to achieve maximum strength?
a) 26 days b) 30 days c) 33 days d) four weeks

4.) Why is anti-Hydro put into concrete?
a) Remove water b) prevent freezing c) increase cure strength d) None

5.) What is a form release agent used for
a) Sign off on a pour. b) Increase bonding of forms c) allow separation d) none of the above

6.) A core sample of fresh concrete is taken to?
a) Measure thickness b) verify strength b) check color d) sample sand content

7.) A riser clamp is usually found?
a) On a stair b) On a pipe c) in a wall d) d) on a floor drain

8.) A fusible link is used on.
a) Fire door b) Fire damper c) Neither d) both

9.) A fire damper is not found?
a) In duct work b) in party walls c) in exhaust lines d) above ceilings

10.) Flush valves are usually found
a) In kitchens b) In boiler rooms c) In lavatories d) In laundry

11.) An OS&Y valve is used to:
a) Visibly observe valve position b) measure steam d) monitor drains d) None of these

12.) RIC-WIL pipe is usually found.
a) in a school b) underground c) in a factory d) in a bank

13.) The Sweets catalogue is used for:
a) buying candy b) research & Specifications C) preparing plans d) waste

14.) 220/240 volt current is available in these phases:
a) Alpha b) Beta c) Delta d) a+b+c e) a+c

15.) A "home run" usually refers to:
a) A four bagger b) Direct connect to breaker c) 220 volt connection d) 277 Volt Connection

16.) To "ring out" an electrical system requires a(n).
a) Amprobe b) megometer c) continuity meter d) all of these

17.) Wire load capacity is based on?
a) Wire size b) length of run c) draw requirements d) all of the above

18.) 18) To "sister" a framing member is to:
a) Affix it to an existing b) place in a different position c) sandwich it d) all e) None of the above

19.) A "stiff leg" is used for?
a) Bracing b) walking c) cabinetry d) closets

20.) A lintel is found?
a) Under an door opening b) over a wall c) in a closet d) over an opening

21.) Lintels are made of?
a) Wood b) steel c) concrete d) any of the above

22.) The total insulating measurement of a building is referred to as the __Value.
a) R b) A c) E d) U

23.) Durawall is usually found?
a) In a CMU wall b) On a ledger c) On the windward wall d) In poured concrete wall

24.) Stack bond wall construction refers to?
a) CMU blocks offset b) Vertically stacked block b) Cinder blocks d) Soldier courses only

25.) A brick soldier course is?
a) Set horizontally b) Set at an angle c) Set vertically d) Any of these E) None of these

26.) A homogeneous concrete pour is?
a) Only done on Tuesday b) Always done on a weekend c) Continuous d) None of the above

27.) A "cold joint" in a concrete pour refers to?
a) An interrupted pour b) Poor joint adhesion c) Non-homogenous d) All of the above

28.) A "she-bolt" in concrete construction is found
a) On a woman ironworker b) In a form c) Only a flat surface d) None of the above

29.) Sub grade waterproofing is found
a) On walls b) On flat surfaces c) Between pours d) Any of the above

30.) Built up roofing is comprised of felt and?
a) Coal tar pitch b) Steep asphalt c) Flat asphalt d) Dead Level Asphalt e) Any of the above

31.) Roofing aggregate consists of?
a) Blast furnace slag b) White Crystal spar c) Pea gravel d) Any of the above

32.) The normal weight per square of the roofing aggregate on a BUR is?
a) 100 # b) 200# c) 400# d) 1000# e) None of the above

33.) Common EPDM roofing applications are ?
a) Ballasted b) Cemented in place c) Mechanically fastened d) Any of the above

34.) Terne roofing is?
a) Metal b) Tile c) Composition d) Built up in layers

35.) Metal roofing is applied in which fashion ?
a) Flat seam b) Standing seam c) Batten seam d) All of the above

36.) Green colored copper is known as?
a) Oxidized b) Striated c) Patina d) Faux

37.) Tile roofing can be?
a) Clay b) Concrete c) Glazed d) Plastic e) Any of the above

38.) Modified Bitumen roofing is.
a) Rubberized asphalt b) Torch applied c) Applied in hot asphalt d) Not applied with coar tar pitch e) All of the above

39.) A ballasted EPDM roof will have what weigh of ballast per SF.
a) 1000# b) 100# c) 400# d) 10# e) None of the above

40.) A portable batch plant produces?
a) Sand b) CMU c) Concrete d) Batches

41.) A chair carrier for plumbing is found?
a) In a wall b) In a closet c) No such thing. d) On the floor

42.) A cooling tower is normally located?
a) In an AC system b) To act as an evaporator c) On the roof d) All of the above